Hi Guys,
We want to change the cost center, location and plant for assets.. now we have prepared an LSMW for change the data. Now for eg
Asset 1- date of interval 15/06/2016 cost center ,plant and locations is to be changed to 1
Asset 2 (diffrent Co.code) date of interval 15/06/2016 cost center ,plant and locations is to be changed to 1
Now when i am running the LSMW in foreground. System is updating the master data but when i go to AS02 and check the assets
Asset 1 is updated but when i go to asset 2 system deletes the old data and updates the new one..
Can anyone guide why system is deleting the line time?
PS: Experts please give ur valuable feedback. its quite URGENT.
Regards
Abhay